Kai 50 · Shore power

Grøtsund

In operation
Shore power connection in progress at Grøtsund, with a vessel alongside
Specifications

1 000 kW

Connected load

Apparent power 1 000 kVA
Connected load 1 000 kW
Connection points 2
Standard IEC/IEEE 80005-3

Pre-arrival coordination, technical questions and billing for this facility are handled by the Fjuel Tromsø team.

Contact our team
More

Other Facilities